Information Center
Information Center
Knowledge Center
2023-10-08

A notification about MTCTE Phase V was launched

Share:

A notification about MTCTE Phase V was launched recently, along with the details of implement. Acceptance of applications on MTCTE portal starts from 01.07.2023 and certification becomes Mandatory since 01.07.2024. As on the date of submission of test reports, the validity of test reports/results issued by foreign labs accredited by ILAC signatories from non-border sharing countries for technical parameters only shall be up to two years for the said products listed below.

Product Name

Product Variant Name

ILAC report acceptance

Base Station for Cellular Network for 5G 

1. BTS with Multi Standard Radio

Yes

2. Active Antenna System-OTA

3. Base Station 5G NR Type 1C

4. Base Station 5G NR Type 1H

5. Base Station 5G NR Type 1O

6. Base Station 5G NR Type 2O

7. Hybrid Active Antenna System

5G Core

1. AMF (Access and Mobility Management Function) 

Yes

2. AuSF (Authentication Server Function)

3. BSF (Binding Support Function) 

4. CHF (Charging Function)

5. NEF (Network Exposure Function) 

6. NSSF (Network Slice Selection Function)

7. PCF (Policy Control Function)

8. SMF (Session Management Function) 

9. SMSF (Subscriber Data Management Function) 

10. UDM (Unified Data Management)

11. UDR (Unified Data Repository)

12. UPF (User Plane Function)

Hypervisor

Hypervisor

Yes

E-band Fixed Radio Relay Systems

1. E-Band MW Full Outdoor System

Yes

2. E-Band MW Outdoor System plus Indoor System

Converged Multiservice Application Access   Equipment

C-MSAAE

No

 IP Terminal

SIP Terminal

No

Hybrid Set Top Box

Hybrid Set Top Box

No

For more details, please inquire BTL Inc.

Relevant information

Canada ISED Update No.2 | RSS Gen Issue 6: Analysis of General Compliance Standards for Radio Frequency Equipment
2026-08-21

Canada ISED Update No.2 | RSS Gen Issue 6: Analysis of General Compliance Standards for Radio Frequency Equipment

Last week, we mentioned that Innovation, Science and Economic Development Canada (ISED) released RSS 310 Issue 6: Licence Exempt Radio Frequency Devices...

CRA Implementation Enters a Critical Phase
2026-08-21

CRA Implementation Enters a Critical Phase

In August 2026, preparations for the implementation of the EU Cyber Resilience Act (CRA) entered a critical stage. With the reporting obligations set to take effect on September 11, 2026, drawing near, the European Commission and the European Union Agency for Cybersecurity (ENISA) have been intensively issuing implementation guidance and materials related to the single reporting platform.

Canada's ISED Officially Releases RSS-310 Issue 6: Major Updates to Radio Frequency Equipment Requirements
2026-08-03

Canada's ISED Officially Releases RSS-310 Issue 6: Major Updates to Radio Frequency Equipment Requirements

Innovation, Science and Economic Development Canada (ISED) has formally issued RSS-310, Issue 6, “Licence-Exempt Radio Apparatus: Category II Equipment,” replacing Issue 5, which has been in effect since 2020

Privacy Preference Center

We use cookies to allow our website to function properly, personalize content and advertisements, provide social media features, and analyze traffic. We also share information about your use of our website with our social media, advertising, and analytics partners.

View Privacy Policy

Manage consent settings

Necessary Cookies

Uniformly activate

The operation of the website relies on these cookies, and you cannot disable them in the system. These cookies are typically set based on your actions (i.e., service requests), such as setting privacy preferences, logging in, or filling out forms. You can configure your browser to block or prompt you about these cookies, but this may cause certain website functionalities to not work.

Select Language