Brazil's ANATEL has made significant updates to its RF equipment regulations, aligning several technical specifications with international standards.
Brazil's National Telecommunications Authority (ANATEL) recently officially released Law No. 14158, which makes a series of important revisions to the technical specifications and testing procedures for existing radio frequency (RF) equipment. This update aims to promote the integration of Brazilian technical standards with mainstream global practices, covering key areas such as vehicle radar, wireless audio, millimeter-wave communications, and next-generation Wi-Fi. The new regulations will officially take effect on April 6, 2026. During the transition period, existing standards can still be used, but ANATEL recommends that all relevant parties begin product certification and compliance work in accordance with the new regulations as soon as possible.
Key technical specification updates are as follows:
1. New Equipment Categories and Definitions:
The definition of vehicle radar systems (covering all land and water vehicles) has been clarified, and new technical specifications for wireless audio systems in the 54–608 MHz band have been added, referencing the ETSI EN 300 422-1 standard, achieving technical unification in this field.
2. Opening of High-Frequency Applications:
A new regulatory framework has been added for the 116–246 GHz band, establishing clear power limits, measurement bandwidth, and usage restrictions (e.g., prohibition of aircraft and satellite use) for fixed point-to-point links and backhaul applications above 100 GHz. Radar use is permitted in airport areas and by ground-based aircraft.
3. Comprehensive Adjustment of 5 GHz Band Rules:
Rules for the 5.15–5.925 GHz band (UNII band) have been systematically revised to fully align with international standards (ETSI/FCC). Updates include detailed power requirements for different equipment types (e.g., access points, client equipment), the introduction of bandwidth-related power calculation formulas, strengthened out-of-band and spurious radiation control, and an increase in the dynamic range requirement for Transmit Power Control (TPC) from 3 dB to 6 dB.
4. Expanding the 57-71 GHz Band Applications:
The applicable range of this band has been expanded from 57-64 GHz to 57-71 GHz, setting clear power limits for field interference sensors (FDS) and other devices. This aims to promote the application of 60 GHz band sensing technology in scenarios such as detection and gesture recognition.
5. Clarifying 6 GHz Wi-Fi Testing Requirements:
Test procedures have been revised to ensure that Brazil's testing methods for devices in the 5.925-7.125 GHz band (for Wi-Fi 6E/7) are consistent with the US FCC guidelines, while maintaining protection requirements for the 5.85-5.925 GHz vehicle-to-everything (V2X) band.
Impact and Action Recommendations
This regulatory revision represents a systemic upgrade to Brazil's radio frequency regulation, with significant impacts on relevant equipment manufacturers, certification laboratories, and exporters. To ensure smooth product entry into the Brazilian market, relevant companies should:
* Timely assess the compliance of existing and R&D products, paying particular attention to power adjustments for 5 GHz Wi-Fi devices, testing updates for 6 GHz devices, and regulations regarding newly added high-frequency bands.
* For modules that may be affected by new regulations (such as increased TPC requirements) and require firmware upgrades or hardware redesigns, advance planning is recommended.
BTL, a professional laboratory with many years of experience in testing and certification, is committed to providing efficient and reliable compliance solutions for global clients. Regarding the Brazilian ANATEL certification and related testing requirements, we have integrated resources and optimized processes to create a one-stop service platform covering the entire lifecycle from pre-testing, localization adaptation, formal application to certificate maintenance, helping clients' products enter the Brazilian and Latin American markets smoothly and quickly.
Relevant information
CRA Implementation Enters a Critical Phase
In August 2026, preparations for the implementation of the EU Cyber Resilience Act (CRA) entered a critical stage. With the reporting obligations set to take effect on September 11, 2026, drawing near, the European Commission and the European Union Agency for Cybersecurity (ENISA) have been intensively issuing implementation guidance and materials related to the single reporting platform.
Canada's ISED Officially Releases RSS-310 Issue 6: Major Updates to Radio Frequency Equipment Requirements
Innovation, Science and Economic Development Canada (ISED) has formally issued RSS-310, Issue 6, “Licence-Exempt Radio Apparatus: Category II Equipment,” replacing Issue 5, which has been in effect since 2020