For SAR testing is too much required and it's took too much time. If your product have support the smart antenna, p-sensor and power redownation,you will take 1~3 month to test. The IEC is currently working on new regulations, IEC 62209-3 ED1 and IEC/IEEE 62209-1528 ED1.
IEC 62209-3 ED1:Human exposure to radio frequency fields from hand-held and body-mounted wireless communication devices - Human models, instrumentation, and procedures - Part 3: Vector probe systems (Frequency range of 100 MHz to 6 GHz)
It’s define the require for the Vector probe systems, at the time , we refer the IEC PAS 63151-2018。
IEC/IEEE 62209-1528 ED1:Human exposure to radio frequency fields from hand-held and body-mounted wireless communication devices - Human models, instrumentation, and procedures: Measurement procedure for the assessment of specific absorption rate of human exposure to radio frequency fields from hand-held and body-worn wireless communication devices (Frequency range of 4 MHz to 10 GHz)
In this standard is combine the IEEE 1528 and IEC 62209-1 / -2, and add how to reduce the test by the robot SAR system and fast SAR system at the same time.
The progress of the regulations is as follows:
● Jan-2019 : final text for FDIS revised by all IEC TC106 experts
● March-2019 : the document is sent to the National Committees members for final review
● May-2019 : FDIS is ready for publication
How to quickly finish the SAR test? It’s a big problem for all test lab, but now, it have two device are cSAR 3D and art-man on the market and the standard will be complete. About the SAR test will be reduce a lot of test time in feature.
Relevant information
EU Releases Exemption Guidelines on Removability and Replaceability of Portable and LMT Batteries — Multiple Product Categories Relief Granted
On July 14, 2026, the European Commission published the "Commission Guidelines to Facilitate the Harmonised Application of Provisions on the Removability and Replaceability of Portable and Light Means of Transport (LMT) Batteries" (Commission Notice C(2026) 5032 final). These guidelines aim to provide a uniform interpretative framework for the implementation of Article 11 of the EU Battery Regulat
6G Developments: Past, Present and Future
The formulation of 6G standards has entered a more concrete phase. At the 3GPP RAN Plenary Meeting held in Singapore in June 2026, the industry made progress in multiple key research areas and finalized the timeline for Release 21, which is regarded as the first standard version expected to formally define 6G.
Overview of EN IEC 61000-4-29:2026
The key focus of the 2026 edition is to address new DC power distribution environments, especially higher-voltage DC systems. It also clarifies test generator capability, duration tolerance, current limitation during short interruptions, inrush current verification, result evaluation, and test report requirements. For products using 24 Vdc, 48 Vdc, 380 Vdc, 400 Vdc, 800 Vdc, or other DC input pow